Recent Projects:
2009
 |
Black Hills Tree Appraisal. Using methodology described in the
Guide for Plant Appraisal 9th Edition ponderosa pine trees cleared
during a powerline corridor tree removal were appraised to determine
values. The powerline corridor was first measured to determine legal
boundaries of the easement. The stumps and trees that were cleared, and
had been growing outside of the easement, were appraised to determine
values.
|
 |
Bighorn County Firewise Coordinator (ongoing).
Collaboration with local government, local fire authorities, and state and
federal government under the direction of the Bighorn County Fire Warden.
Coordination of public education efforts aimed at mitigating against the
threat of catastrophic fire in the wildland-urban interface (WUI).
Development of the 2009 Bighorn County CWPP Addendum addressing hazardous
fuels conditions in riparian areas county-wide.
|
 |
Silviculture and Fire and Fuels Specialist, East
Deerlodge Valley Environmental Impact Statement (EDLV EIS). Specialist
Report development (ongoing). Development of specialist reports
meeting the standards set forth in the National Environmental Policy Act (NEPA), 40 CFR §1500-1508.
|
2008
 |
Project Manager,
Park County Community Wildfire Protection Plan
(CWPP) (Completed).
Collaborated with local government, local fire authorities, and state and
federal government, to develop a comprehensive plan for the protection of
life, property, and critical infrastructure from catastrophic fire in the
wildland-urban interface (WUI). The
final document provides a platform to initiate fuels treatments designed
to mitigate against wildfire destroying life, structures and essential
infrastructure.
|
 |
Cow Creek Aspen Enhancement Project (Completed). Bureau
of Land Management, Cody FO. All conifers including Douglas fir, limber
pine, and Rocky Mountain juniper were were cut and "jackstrawed" in and
around aspen clones. BLM personnel will return with a prescribed fire to
eliminate more conifers and stimulate regeneration of aspen.
|

Before
After

Before
After

Before
After
2007
 |
Leavitt Landowner
Forest Stewardship Plan Amendment (private) (completed). Timber sale
preparation and administration on adverse slopes in the Battle Creek
drainage, Bighorn Mountains, Wyoming. ArcMAP GIS software used to identify
topographic conditions acceptable for the use of a cable yarding sytem to
harvest timber. Trimble GeoExplorer GPS used to traverse harvest units.
|
 |
Town of Greybull
Street Tree Inventory (completed). ArcGIS and i-Tree software used to
inventory tree and planting spaces on Town property. A Trimble GeoExplorer
with Pocket PC used for data collection in field. A management plan and
complete GIS database provided to Town.
|
|
|
GreybTreInv_photo
|
|
|
|
 |
Black
Mountain Layout II (completed). Pre-sale timber marking, cruise design,
timber cruise, volume determination, road layout, property boundary
determination, GPS traversing and unit boundary marking. |
2006
 |
Project Manager:
Blucher Creek Timber Stand Improvement.
Pre-commercial thinning of 70 acres of lodgepole pine in the South Pass
area of the Wind River Mountains, Wyoming.
|
|
|
Blucher Creek TSI
|
|
|
|
Blucher Creek TSI
|
|
|
|
Blucher Creek TSI
|
|
|
|
 |
Project
Manager, Black Mountain Layout I. Forest reconnaissance of all BLM
administered forest lands in the Black Mountain area (west slope of the
Bighorn Mountains, Wyoming). Forest health assessments, harvest unit
layout, pre-sale timber marking, cruise design, timber cruise, volume
determination, road layout, property boundary determination, GPS
traversing and unit boundary marking. Approximately three million board
feet (mmbf) of sawtimber prepared for sale (forest management occurred in
response to a severe infestation of Douglas fir and spruce bark beetle).
Timber was later purchased and harvested by a local mill.
|
 |
Project
Manager, Medicine Lodge
State Archaeological Site. Historic Apple Orchard tree
planting. Site investigation of existing environmental conditions for the
proper installation of 25 apple trees, including planting, staking, and
mulching. To avoid destruction of cultural resources, soil disturbance
activities occurred in cooperation with an archaeologist from the State
Historic Preservation Office. Furnished labor, equipment, supplies, and
materials. |
2005
 |
Fuels Specialist,
Burner Environmental Assessment. Environmental
analysis of 17,801 acres of National Forest System (NFS) lands. Worked
cooperatively with and under the direction of the Forest Service to
prepare environmental documents meeting the standards set forth in the
National Environmental Policy Act (NEPA), 40 CFR §1500-1508.
|
 |
Silviculturist, Burner Environmental Assessment, Silviculturists’ Report.
Developed forest management alternatives aimed at improving forest health
in project area located in the Bearlodge Mountains north of Sundance,
Wyoming. ArcGIS, MS Access, and Forest Vegetation Simulator (FVS) software
used to analyze forest inventory data and make comparisons of management
scenarios.
|
 |
Project Manager, North Fork Bear Gulch Timber Sale (private): Timber sale
preparation and administration. 700 thousand board feet (mbf) sawtimber
prepared for sale and harvested.
|
|
|
log processor
|
|
|
|
Spruce bark beetle mortality_Unit 58b_Flitner_2005
|
|
|
|
 |
Project Manager, Hudson Falls Pipeline Biological Evaluation. Analysis area
consists of a one-mile water pipeline corridor through USFS and BLM
administered lands ending on private property. Identified all listed,
proposed, and sensitive species known or expected in the analysis area and
those species the project could potentially affect; analyzed cumulative
effects resulting from the planned project in relationship to existing
conditions and other related projects; made recommendations for removing,
avoiding, or compensating for any adverse effects; maintained project file
in accordance with NEPA guidelines.
|
|
|
070605_Area Photo
|
|
|
|
FlowingAtRoadX_081705
|
|
|
|
VegPhotos_062705 017
|
|
|
|
USFS_BLM_TFS personnel assessing disturbance
|
|
|
|
 |
Project Manager,
Flitner
Ranch Landowner Forest Stewardship Plan development. Plan includes forest
management recommendations for the 1,100 forested acres within the
ownership. |
2004
 |
Project Manager South Fork Bear Gulch Timber Sale (private): Timber sale
preparation and administration. 1.2 million board feet (mmbf) sawtimber
prepared for sale and harvested.
|
 |
Project Manager, Scab Creek Timber Sale Preparation and Cruise. Marked and
cruised 29 acres of Douglas fir sawtimber on the west slope of the Wind
River Mountains, Wyoming, Pinedale BLM Field Office.
|
 |
Project Manager,
Big
Horn County Mountain Community Wildfire Protection Plan (CWPP).
Collaborated with local government, local fire authorities, and state and
federal government, to develop a comprehensive plan for the protection of
life, property, and critical infrastructure from catastrophic fire in the
wildland-urban interface (WUI) within the 220,000 acre project area.
Facilitated local discussions, identified key community treatment
priorities, collected scientific forest and fuels data, collected
structure ignitabilty data, and provided recommendations for reducing the
hazard of destructive wildfire to homes and essential infrastructure. The
final document provides a platform to initiate fuels treatments designed
to mitigate against wildfire destroying life, structures and essential
infrastructure.
|
 |
Project Manager, Bartlett Creek Timber Sale Preparation and Cruise. Marked
and cruised 155 acres of primarily Douglas fir sawtimber on the southern
end of Commissary Ridge in southwest Wyoming, Kemmerer BLM Field Office.
|
|
|
Determining tree quality
|
|
|
|
Marking timber
|
|
|
|
TFS timber marking crew member
|
|
|
|
 |
Project Manager,
Kaycee Community Forest
Assessment. Tasks included: an assessment of the public trees, an
assessment of the current municipal program in place for the management of
the community forest, and recommendations for strategies aimed at
maintaining and improving the Community Forest Program.
|
 |
Project Manager,
Sheridan Community Forest
Assessment. Tasks included: an assessment of the public trees, an
assessment of the current municipal program in place for the management of
the community forest, and recommendations for strategies aimed at
maintaining and improving the Community Forest Program.
|
 |
Project Manager, Leavitt Timber Sale (private) (ongoing): Timber sale
preparation and administration. Approximately two million board feet (mmbf)
of sawtimber prepared (one mmbf harvested in 2006).
|
 |
Project
Manager,
Greybull Library and Museum Xeriscape Project.
surveying the site; increasing the amount of shade to the existing
buildings, railroad car museum, and picnic areas; planting healthy trees;
pruning, removing and/or replacing overgrown, unhealthy, and/or
potentially hazardous existing trees; reducing the current amount of
grass/weeds, thereby cutting down on maintenance and water usage;
developing a educational, botanic garden using native, and low water use
shrubs; improving the quality of the soil with the addition of organic
matter and an improved irrigation system. |
|
| |
|